Net driving time for a trip/ Netto Fahrzeit für einen Trip
I am inquiring whether there is already a feature, or if you could consider implementing a function, that allows for the tracking of total driving time and total charging time for a specific journey. I envision a feature where one can mark specific trips or charging sessions, or select a particular time frame. Subsequently, the system should be able to distinctly display the net driving time and the time spent charging. For instance, “For our trip to the Baltic Sea, we required a total of 6 hours of actual driving time and an additional 45 minutes for charging.” I would be very grateful if you could consider incorporating this feature.
Thank you in advance for your attention to this request.
Best regards,
Steffen
——-
Gibt es bereits die Möglichkeit, oder könnten Sie eine Funktion implementieren, die es erlaubt, die Gesamtfahrzeit und die Gesamtladezeit für eine bestimmte Reise zu erfassen? Ich stelle mir vor, dass man spezifische Fahrten oder Ladevorgänge markieren oder einen bestimmten Zeitraum auswählen kann. Anschließend sollte das System in der Lage sein, die reine Fahrzeit und die benötigte Ladezeit separat auszuweisen. Ein praktisches Beispiel wäre: „Für unsere Fahrt zur Ostsee benötigten wir insgesamt 6 Stunden reine Fahrzeit und zusätzlich 45 Minuten für das Laden.“ Ich wäre Ihnen sehr dankbar, wenn Sie diese Funktion in Betracht ziehen könnten.
Vielen Dank im Voraus.
Mit freundlichen Grüßen, Steffen
-
According to my experience a trip ends once the vehicle is parked (at least for Tesla). Therefore the reported trip duration is already the net driving time for each trip. Once you merge all trips of a journey I guess the total time should be the total driving time (not tested though).
0
Bitte melden Sie sich an, um einen Kommentar zu hinterlassen.
Kommentare
1 Kommentar